Netrokona:A long-awaited initiative to restore the Magra River in Netrokona has finally commenced with the launch of a Taka 48.49 crore project. The project aims to free the river from illegal encroachment, remove pollution, and restore its navigability.
According to Bangladesh Sangbad Sangstha, the inauguration ceremony took place on Saturday afternoon on the riverbank near the Zila Parishad office, marking the start of excavation and eviction activities under the project titled 'Revitalisation of the Magra River in Netrokona District'. Netrokona-2 (Sadar-Barhatta) constituency lawmaker and district BNP president Professor Dr. Md Anwarul Haque formally inaugurated the project as the chief guest.
Executive Engineer of Netrokona Water Development Division Md Shakhawat Hossain presided over the programme. The event was attended by notable figures including Zila Parishad Administrator Md Nuruzzaman, Superintendent of Police Md Tariqul Islam, Deputy Director of Local Government AKM Abdullah Bin Rashid, Additional Deputy Commissioner (General) Wahiduzzaman, and Netrokona Sadar Upazila Nirbahi Officer Monija Khatun.
Addressing the programme, Anwarul Haque issued a stern warning to illegal river encroachers, emphasizing that river restoration was part of the government's election commitments. He warned against any environmental destruction for the benefit of a few individuals and declared that strict legal action would be taken against those obstructing the river recovery initiative.
Pollution has severely damaged both the river water and its bed, prompting a focus on improving the town's waste management and sewerage systems alongside excavation. The lawmaker revealed that a delegation from England would visit Netrokona on November 17 or 18 under a public-private partnership initiative. The proposed scheme aims to process waste materials into fertilizer, organic manure, and biogas without municipal funding, potentially making Netrokona the first municipality in the country to undertake such an initiative.
Plans were also announced to construct walkways along both banks of the river after excavation, along with extensive tree plantations and street lighting, to create an attractive and pedestrian-friendly environment for city residents.
Executive Engineer Shakhawat Hossain presented the project details, stating that the estimated cost was Taka 48 crore 49 lakh 70 thousand. The project includes re-excavating a total of 41 kilometers of the river, from its 56.00-kilometre to 97.00-kilometre point. Major components also involve the removal of 1,004 illegal structures along the riverbanks and 1.60 kilometers of landscaping. The project is expected to help protect around 5,560 metric tonnes of food grains from flood damage.