Khulna:Construction of a modern sluice gate-cum-pump house has commenced in Khulna city to tackle its persistent waterlogging issues.
According to Bangladesh Sangbad Sangstha, the project was inaugurated by Khulna City Corporation (KCC) Administrator Nazrul Islam Manju beside the Rupsha wholesale fish market. The initiative, with an estimated cost of Tk 60 crore, is part of the "Improvement of Drainage System to Resolve Waterlogging in Khulna City" program, supported by the Ministry of Local Government, Rural Development and Cooperatives.
During the inauguration ceremony, Administrator Manju highlighted that the project aims to address the city's long-standing waterlogging problems. He expressed optimism that the new facility would significantly reduce waterlogging and enhance the quality of life for residents. Manju also reiterated KCC's dedication to improving civic services and requested cooperation for the project's successful completion.
Officials explained that rainwater from Khulna's major drains flows through the Rupsha area into a canal, eventually reaching the river. However, high tides and heavy rains often impede this outflow, causing temporary waterlogging and public inconvenience. The new system will see the Rupsha sluice gate automatically closing during high tides, with pumps discharging rainwater into the river.
The project, expected to solve waterlogging in key city areas, is slated for completion by June 2027. Six sluice gates, spanning from Customs Ghat to Lobonchara, will be controlled via a central unit, with the option for KCC office management if needed.
Key attendees at the inauguration included KCC Chief Executive Officer Razib Ahmed, Secretary Md Reza Rashid, Chief Engineer Moshiuzzaman Khan, Executive Engineer Sheikh Md Masud Karim, ward officials, representatives of the contracting firm, and local dignitaries.