Dhaka:Huge piles of plastic waste have accumulated along the banks of the Buriganga River, stretching nearly five kilometers from Babubazar Bridge to Kholamora Ghat in Kamrangirchar. Despite the recent removal of 300 tonnes of waste from the Islambagh section, significant heaps remain, raising environmental and public health concerns.
According to Bangladesh Sangbad Sangstha, environmentalists warn that the accumulated plastic waste is entering the river, affecting water quality and aquatic biodiversity. Sharif Jamil from Dhoritri Rokhhay Amra (DHORA) highlighted the risks of microplastics, which have been found in aquatic organisms and pose health threats to humans through the food chain.
Workers in nearby plastic factories, who use discarded plastic as raw material, report harsh working conditions. Zakir Hossain, a factory worker, noted the difficulty in breathing due to the smell of plastic dyes. The High Court has directed the complete removal of plastic waste from the riverbank and measures to prevent future dumping.
Government agencies, including the Bangladesh Inland Water Transport Authority (BIWTA) and Dhaka South City Corporation (DSCC), are actively removing waste. BIWTA's Md Mobarak Hossain stated that efforts include cleaning the riverbank, planting trees, and installing iron fencing. DSCC launched a "Shopping in Exchange for Waste" campaign to manage urban waste sustainably.
Local residents stress the need for increased public awareness to prevent waste dumping. Despite regular removal, waste continues to be dumped, undermining cleanup efforts. Boat workers emphasize cleaning the riverbed and stopping further dumping to restore the Buriganga. A meeting led by the prime minister discussed launching waterways around Dhaka and improving river conditions.
Source Bangladesh Sangbad Sangstha